1000 characters left

Recent Projects

 Case Study

Retail Store Shepherds Bush

Installation of Air Conditioning systems to serve sales floor.

 

 

 

 

 

 

Job Date: September 2016   Read More
 Case Study

Installation of Cabinet Heater Travis Perkins Blandford

To remove from site one redundant oil fired cabinet heater, replacing with one new Reznor oil fired cabinet heater.

 

 

 

 

 

 

 

 

Job Date: January 2016   Read More
 Case Study

Installation of Boiler Travis Perkins Stoke

To remove an existing Ideal Concord cast iron boiler from the ground floor and Install one new Ideal Evomax fully condensing boiler to the first floor. Alteration to gas service and LPHW pipework.

 

 

 

 

 

 

Job Date: January 2016   Read More
 Case Study 1

HVAC for Anytime Fitness Exeter

Installation of heating, cooling and heat reclaim ventilation to serve gymnasium. Installation of drainage, hot and cold water services and sanitaryware for wetroom changing facilities

 

 

 

Job Date: November 2015 Read More
Case Study 3

Data Centre Cooling for University Campus

Supply and installation of close control cooling systems to university data centre with modern energy efficient Airedale equipment.

 

 

 

Job Date: September 2015 Read More
Case Study 4

HVAC for National Office Equipment Supplier

Installation of mechanical services to server 3 storey office block, including air conditioning, ventilation and domestic hot and clod water supplies.

 

 

 

 

Job Date: September 2014 Read More
 Case Study 2

HVAC for Anytime Fitness Yate

Installation of heating, cooling and heat reclaim ventilation to serve gymnasium. Installation of drainage, hot and cold water services and sanitaryware for wetroom changing facilities

 

 

 

 

Job Date: November 2013 Read More
 
1000 characters left